01Our services

From design to aftercare

  • DesignEngineering design

    Site survey, airflow, ductwork and fan calculations, and selection of the air treatment system

    • Hood design and airflow calculation (CMH)
    • Duct sizing, duct velocity (m/s) and pressure loss (Pa)
    • Fan selection at the system operating point
    • Calculation review and sign-off for imported equipment

    You receive: Calculations, system drawings, equipment list and quotation

  • FabricationFabrication & installation

    Build the equipment and install the complete system, with a test run

    • Vessels made from materials that resist each plant’s chemicals, such as steel, stainless steel, galvanised steel and FRP
    • Install hoods, ductwork, fans, pumps and stacks
    • Test run, measuring air velocity and airflow against design values

    You receive: A running system, test-run results, an operating manual and operator training

  • ServiceMaintenance & service

    Scheduled checks, consumable replacement and a service report

    • Check fans, belts, pumps, nozzles, media and pH control
    • Clean media and nozzles; replace activated carbon when spent
    • Measure airflow against design values, for both our systems and the plant’s existing ones

    You receive: A service report with photos and recommendations (Word and PDF)

  • SupplyMaterials & equipment

    Activated carbon, packing media and spare parts for treatment systems

    • Activated carbon for vapours and odours
    • Packing media, nozzles and wet scrubber spares
    • Carbon quantity and change-out interval calculated with your order

    You receive: Materials chosen to suit your system, not just to make a sale

02How it works

Six steps from site visit to a running system

  1. Step 1

    Survey & data

    Process, pollutant type and load, available space

  2. Step 2

    Design & calculate

    Airflow, duct velocity, pressure loss, fan size

  3. Step 3

    Drawings & quote

    Preliminary drawings, equipment list and quotation

  4. Step 4

    Fabricate

    Vessels and parts built to the approved drawings

  5. Step 5

    Install & test

    Commission and measure airflow against design values

  6. Step 6

    Hand over & support

    Manual, operator training and maintenance service

An air pollution problem?

Send us your site details for an initial assessment by our engineers.